Feeling good about where you live makes you happy, and it makes the members of your homeowners' association or the residents of your apartment community happy too. A well-maintained community feels safe, and part of that comes from streets, parking lots and walkways that are smooth, properly marked and clear of debris.
Since 2001 we have worked with neighborhoods and communities across North Texas on street and parking lot repair, resurfacing and new construction, including the HOA roads in Benbrook that were rebuilt on a reclaimed base. Our own crews and equipment do everything from grading and base stabilization to paving, sealcoating and striping, so the board deals with one contractor.
We also help boards and community managers put a pavement maintenance plan in place: the repairs that need to happen now, and a forecast of preventive work and budget for the years ahead, so assessments are planned rather than sudden. Our estimators will attend a board meeting to listen, answer questions and walk through the options.
Communities we work with
- Homeowner associations with private streets
- Apartment communities and multifamily
- Condominiums and townhome communities
- Mobile home and manufactured home communities
- Retirement and senior living communities
- Gated subdivisions and master-planned communities
Streets, parking lots and everything between
A community has more pavement than most people think: the streets, the guest parking, the carports and drive aisles at an apartment complex, the clubhouse and pool lot, speed bumps, curbs and the drainage that keeps water off all of it. We work on all of it.
- New HOA roads and street rebuilds, including reclamation, where the old street is ground up and rebuilt in place as the new base, and base stabilization for soft subgrade. See road construction.
- Overlays where the base is sound but the surface is worn. See resurfacing and overlays.
- Repairs for potholes, alligator cracking and utility cuts. See asphalt repair.
- Sealcoating and crack sealing to protect streets and lots between major work. See sealcoating.
- Striping, numbered and assigned stalls, ADA spaces, fire lanes, speed bumps and parking stops. See striping and ADA layout.
- Chip and seal for subdivision streets where a lower-cost surface fits the budget. See chip and seal roads.


Phased by street so residents can get home
Nobody gets paved in. We plan community work street by street and section by section, so every resident has a way in and out and somewhere to park every night. Residents get notice before each phase with the dates, the hours and where to park, towing is coordinated with management, and the project manager is on site and reachable. Apartment lots are done in sections so the complex never loses all of its parking at once.
What the board receives
A written proposal with photos of the problem areas, the recommended treatment for each street or lot, and where there is more than one right answer, the options and what each means for cost and life. We are happy to present it at a board meeting and answer questions from residents. For a larger community we can write it as a multi-year plan so the work and the assessments are spread out.




